In stockless purchasing, where does the supplier deliver materials?

Study for the CMRP Exam. Prepare with flashcards and multiple choice questions, each with hints and explanations. Get ready with us!

In stockless purchasing, the supplier delivers materials directly to the production area. This method is characterized by the absence of a large inventory held on-site, which aims to streamline operations and reduce the costs associated with maintaining stock. By sending materials directly to production, organizations can minimize handling, decrease the potential for shortages or excess inventory, and promote a just-in-time approach to inventory management.

This system aligns with lean manufacturing principles, where materials are delivered as needed, facilitating a more efficient production workflow. Stockless purchasing is particularly beneficial in environments where space is limited or where rapid changes in production schedules are common, thereby ensuring that materials are available when required without the need to allocate resources to storage.

Other options, such as delivering to a central warehouse or designated stockroom, would defeat the purpose of a stockless system, as they would involve holding inventory before it reaches the production area. Multiple drop-off points could complicate logistics and introduce variability, which contravenes the streamlined objective of stockless purchasing.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy